Medical Gas & Electric upgrades

Clearlake, California
In preparation for expansion of the emergency department, the existing medical gas/electrical facilities were relocated and upgraded. Upgrades included two distinct phases including construction of new concrete structural slab, relocation of propane tanks, connection to existing facilities, and an emergency 750 KW generator and 208 volt 3 phase 3200 AMPS with a new PG&E electrical transformer and concrete pads. We also installed a 1,585-gallon liquid oxygen system and a medical gas storage building that included medical vacuum and medical air systems.
Project Characteristics
- Private Work · Public Work
- Bid Build · Cost Plus · Design Build · Design Assist
- Healthcare · Hospitality · Education · Sustainable · Historic
Contract Amount: $4,550,000
Owner: St. Helena Hospital Clearlake, Adventist Health Care Corporation
Owner’s Representative: Rex Shepherd,
Architect: Stephen Stack, Devenney Architects
Construction Manager: Jay Barrington, Barrington Builders
Completion: November 2010


